CONDO RENOVATIONS

Condo renovations across Toronto & the GTA — kitchens, bathrooms, flooring and layout changes. Board approvals, building coordination and acoustic requirements handled, on a fixed-price quote with a written warranty.
Structure-First Approach
Written Warranty
Fixed-Price Quotes
500+ Projects Completed

Built to Last — Not Just Installed

What makes us different starts before the first material is ordered. GMC Construction is founded and led by an owner who holds a Master's degree in Structural Engineering — so every project is approached with a genuine, advanced understanding of structure, load-bearing changes, drainage, and moisture protection. Most renovation companies focus only on how a space looks. We start with what's underneath, because that's what determines whether your renovation lasts five years or twenty-five.

Condo Renovation Contractors in Toronto & the GTA

Planning a condo renovation Toronto or GTA-wide? Renovating a condo isn’t a smaller version of renovating a house — it’s a different job. Building rules, elevator bookings, noise windows, board approvals and concrete slabs all sit between your plan and the finished space. GMC Construction Inc. renovates condos across Toronto and the GTA with the paperwork and building coordination handled, on a fixed-price quote backed by a written workmanship warranty and 500+ completed projects.

Most delays in condo work aren’t construction problems — they’re approval problems. With 10+ years across the GTA and an owner who holds a Master’s degree in Structural Engineering, we know what property management will ask for, what can and can’t be moved inside a concrete building, and how to plan a schedule that survives contact with a condo board.

Our Condo Renovation Services

Condo Kitchens

Custom cabinetry planned around tight footprints, quartz countertops, and appliance packages sized for condo living — installed with building access rules built into the schedule.

Condo Bathrooms

Full bathroom rebuilds with proper waterproofing — critical in a building where a leak becomes your neighbour’s problem and your liability.

Layout Changes

Opening up a closed kitchen or reworking a floor plan. In concrete buildings some walls can move and some absolutely cannot — we establish which before anything is promised, and bring in a licensed professional engineer for stamped drawings when the building requires it.

Flooring & Sound Control

Most buildings mandate a minimum acoustic rating for flooring underlay. We install to your declaration’s requirements so you pass inspection and keep the peace downstairs.

Electrical & Lighting

Pot lights, under-cabinet lighting and added outlets — worked around concrete ceilings and slab conditions where you can’t simply run wire wherever you’d like.

Board Approvals & Building Coordination

Submission packages, insurance certificates, elevator bookings, service-corridor protection and working within permitted hours — handled so you’re not chasing property management.

How Much Does a Condo Renovation Cost in Toronto?

Condo renovations typically run 10–20% higher than the same scope in a house, because of building access requirements, protection of common areas, restricted working hours and material handling. Most GTA projects fall into these tiers:

Cosmetic Refresh

$15,000 – $30,000

Kitchen or Bathroom

$30,000 – $55,000

With Layout Changes

$110,000 – $160,000

Luxury / Penthouse

$160,000+

These reflect complete, turnkey condo renovations in the GTA for 2026 — including permits where required, board submission packages, building protection, and all trades and finishes. A full unit renovation typically covers kitchen, bathroom, flooring, lighting and painting in a 700–1,100 sq ft unit.

Key factors that affect condo renovation costs:

  • Building requirements — insurance certificates, deposits, elevator fees, restricted hours and common-area protection add real cost and time to every condo project.
  • Layout changes — moving plumbing in a concrete slab is limited and expensive; keeping wet locations where they are saves substantially.
  • Flooring acoustic rating — most declarations mandate a minimum underlay rating, which affects both material choice and installed cost.
  • Access & logistics — a service elevator, loading dock and parking make a project cheaper; a walk-up or single elevator with tight booking windows makes it slower.
  • Finish level — cabinetry tier and countertop material drive the budget in condos exactly as they do in houses.

We assess your unit and read your building’s rules before quoting, so the number accounts for the real constraints. You get a fixed-price, itemized quote after a free in-suite consultation.

Why Choose GMC for Your Condo Renovation?

Structural expertise behind every layout change

In a concrete building, knowing which walls are structural and which are partition is not a guess. GMC is led by an owner who holds a Master’s degree in Structural Engineering — so layout changes are assessed properly before they’re proposed.

We handle the building paperwork

Submission packages, insurance certificates, deposits, elevator bookings and corridor protection — prepared and managed by us, so approvals move instead of stalling in someone’s inbox.

Waterproofing that protects you

A bathroom leak in a condo isn’t just your damage — it’s the units below and your liability. We waterproof to a standard that assumes the worst, because in a stacked building the stakes are higher.

Fixed-price quotes

Condo budgets get squeezed by fees most homeowners don’t expect. We price the building requirements into the quote up front — so the number you agree to is the number you pay.

Respectful, tidy worksites

You share hallways, elevators and walls with neighbours. We protect common areas, work within permitted hours, control dust and clean daily — so your renovation doesn’t become the building’s complaint.

Licensed, insured, proven

Fully licensed and insured with WSIB coverage — the documentation every condo board requires before you get approval — plus 500+ completed projects and a 5.0-star rating from 85+ Google reviews.

What Makes Condo Work Different

Four constraints shape every condo renovation. Understanding them before you start is the difference between a smooth project and a stalled one.

Board Approval Process

Most buildings require a submission package with drawings, contractor insurance and a deposit before work starts. Review can take weeks — starting it early is the single best thing you can do for your schedule.

Concrete Slabs & Plumbing Limits

You can’t cut drainage into a post-tension slab. Wet locations are largely fixed, which means kitchen and bathroom layouts have real limits — and anyone promising otherwise hasn’t checked.

Acoustic Requirements

Declarations typically mandate a minimum sound rating for flooring underlay. Installing below spec can mean being ordered to tear it out — so we build to your building’s number, not a generic one.

Access, Hours & Logistics

Elevator bookings, loading windows, permitted working hours and debris removal routes all shape the schedule. We plan deliveries and disposal around them rather than losing days to a missed booking.

Condo Projects We Take On

Most condo projects in the GTA fall into one of three shapes. Here’s what each typically involves:

Refresh & Update

Flooring, paint, lighting, fixtures and cabinet refacing without moving anything. The fastest, least disruptive way to modernize a unit — and often the easiest to get approved.

Full Unit Renovation

Kitchen, bathroom, flooring, lighting and finishes throughout, with wet locations staying put. The most requested scope — a complete transformation without fighting the slab.

Layout Reconfiguration

Removing partitions to open the plan, reworking the entry or combining spaces. Requires structural assessment and board approval — and it’s where our structural background matters most, with a licensed professional engineer engaged for stamped drawings where required.

How Long Does a Condo Renovation Take?

A cosmetic refresh typically runs 2 to 4 weeks on site. A kitchen or bathroom takes 4 to 6 weeks. A full unit renovation runs 8 to 12 weeks, and layout changes add 2 to 4 weeks on top. Board approval happens before any of it and commonly takes 3 to 8 weeks — which is why we prepare and submit that package as soon as the design is settled.

Serving Toronto & the Greater Toronto Area

GMC Construction Inc. renovates condos throughout Toronto and the GTA — downtown towers, midtown mid-rises and suburban buildings alike. We’ve worked with a wide range of property managers and boards, and we know how different buildings run their approval and access processes.

Let’s Transform Your Condo

Whether you want a refresh, a full unit renovation, or a layout that finally works, we’re ready to help. Call us at 647-450-4466 or request your free, fixed-price quote — and we’ll review your unit and your building’s rules before a single number goes on paper.

Related Services

Explore our other services across Toronto & the GTA:

Our Process

01. Free Consultation

We start with a free consultation to understand your vision and needs for your renovation.

02. Design

Our team creates a custom design plan tailored to your style and budget.

03. Execution

We handle every aspect of the renovation, ensuring a seamless process from start to finish.

04. Final Walkthrough

Once your renovation is complete, we walk you through your new space to ensure it meets your expectations.

Why Choose GMC Construction?

Every project we take on is backed by the same commitments — in writing, before work begins. No surprises, no shortcuts, and no walking away from a problem.

Testimonials

Real Reviews From Our Clients

Accredited & Certified
WSIB Ontario HomeStars Verified Home Depot Pro Houzz Jiffy Pro RenoQuotes RenoAssistance by Desjardins

Get Your Free Home Renovation Estimate

Transform your living space with our professional renovation services. Fill out the form to receive a detailed, no-obligation estimate tailored to your needs.

Personalized Service

Tailored solutions for your unique home renovation needs

Quick Response

Receive your estimate within 24-48 hours

Transparent Pricing

Clear, detailed estimates with no hidden costs

frequently asked questions

How much does a condo renovation cost in Toronto?

Most full unit renovations land between $60,000 and $110,000 in 2026. A cosmetic refresh starts around $15,000, a single kitchen or bathroom runs $30,000 to $55,000, and projects with layout changes reach $110,000 to $160,000. Condo work typically runs 10–20% higher than the same scope in a house because of building access requirements and common-area protection.

Do I need condo board approval to renovate?

Almost always. Most buildings require a submission package with drawings, contractor insurance certificates and a deposit before any work begins, and review can take three to eight weeks. We prepare and manage that package so approval doesn’t become the thing holding up your project.

Can you move my kitchen or bathroom?

Sometimes, but there are real limits. Drainage runs through the concrete slab and generally can’t be re-cut, so wet locations are largely fixed. We assess what’s actually possible in your specific unit before proposing a layout — rather than promising something the building won’t allow.

What flooring can I install in a condo?

Most condo declarations mandate a minimum acoustic rating for underlay beneath hard-surface flooring. Installing below that spec can result in being ordered to remove it. We read your building’s requirement and install to it, so you pass inspection and keep the peace with the unit below.

How disruptive is a condo renovation for neighbours?

We protect corridors and elevators, work within the building’s permitted hours, control dust at the source, and clean daily. Managing that properly is part of the job — a renovation that generates complaints creates problems for you long after we’ve finished.

How long does a condo renovation take?

A cosmetic refresh runs 2 to 4 weeks on site, a kitchen or bathroom 4 to 6 weeks, and a full unit renovation 8 to 12 weeks. Layout changes add 2 to 4 weeks. Board approval happens before site work and typically takes 3 to 8 weeks, so we submit as soon as the design is settled.
Others Services

GMC Construction handles renovations across every space in your home — kitchens, bathrooms, basements, additions and more. Explore our full range of services to see how we can help.

ChatGPT Image Jul 23, 2026, 01_00_23 PM
Bathroom Renovations
Finished basement renovation by GMC Construction Inc. in the GTA
Basement Renovations
Top Commercial Renovations General Contractor in Toronto
Commercial Renovations
Renovated open-concept living space in a Toronto home by GMC Construction Inc.
Home Renovations
Modern kitchen renovation with sleek white cabinets, quartz countertops, and stainless steel appliances by GMC Construction Inc.
Kitchen Renovations
home addition by general contractor in toronto - gmc construction inc.
Home Additions
Store renovation by GMC Construction Inc. in Toronto and the GTA
Store Renovations
office renovations
Office Renovations
Custom home built by GMC Construction Inc. in the GTA
Custom Homes
tv wall
Handyman Services